Permit to work process

We need to be aware of all operations either planned or in progress.

The port is committed to managing health and safety. We maintain a registered Quality Management System for the operation of Portsmouth International Port, which meets the requirements of ISO 9001 (2000) and OHAS 45001:2018.

With this in mind, any port users who employ contractors to work within the port must ensure they follow the contractor requirements below.

Requirements for contractors

All works must be approved by the port
Only competent persons should be employed to carry out the works
Work must comply fully with the relevant health & safety legislation
Work must not negatively affect the operation of the port or any other port users

Permit to work system

If you’re carrying out work at Portsmouth International Port, you may need a permit before you begin. Here you’ll find information about the permit to work system, collecting permits and who to contact for support.

Permit to work

To support this, the port operates a permit to work system. All contractors working anywhere within the port (both inside and outside) must hold a valid permit to work.

The responsibility for issuing permits lies with the nominated Port Authorising Officer, such as the engineering manager, building surveyor, a DPOM, the deputy harbour master, or a pilot.

Collection points

Permits can be collected from:

  • the security supervisors’ office in the main terminal building, or
  • from the freight gate entrance

All contractors must watch the induction presentation before permits are issued. The names of those who complete the induction will be added to a database, which is valid for one year.

System administrators (SOs)

These are the people who must be contacted with full details of the work required. Once the SO is satisfied all necessary health and safety documents are in place, and that the task can be completed safely and competently, they will approve the permit application.

Annual quay passholders

For companies already accessing the port under this agreement, most procedures will remain the same. However:

  • Operatives must now collect a permit to work each time they enter the port
  • This logs them onto the site
  • When leaving, they must hand the permit back to the port operative at the freight gate, who will log them out.

Annual quay passholders must still complete the induction as stated.